Triplex villas at dusk (render)

Meridian Palms

Tadepalli, Vijayawada. 4 BHK triplex villas on 11 acres, from ₹4.1 Cr*

Land
11 acres
Villas
96
Plot sizes
300 to 420 sq yd
Open space
55%

Ninety-six villas under the palms.

Triplex villas with private gardens, a riverside clubhouse and avenues lined with royal palms.

  • Private garden for every villa

    Front lawn and a rear courtyard, no shared walls.

  • East and north facing only

    Plots laid out to Vastu from the master plan up.

  • Riverside clubhouse

    A 25,000 sq ft clubhouse looking over the Krishna.

  • Fifteen minutes to the capital region

    Close to Amaravati and Mangalagiri.

Residences and plans

Living23'7" x 18'7"Family14'11" x 18'7"KitchenUtilityDeckMaster19'10" x 18'7"Walk-inBathBed 214'11" x 24'10"Bed 321'1" x 16'1"Bed 413'8" x 14'11"Bath62'0" overall

Plans open after one verification

Takes about 20 seconds. We also send the cost sheet and payment plan on WhatsApp.

Carpet area
3,850 sq ft
Facing
East
From
₹4.1 Cr*

*Illustrative. Final price depends on floor and facing.

Living23'7" x 18'7"Family14'11" x 18'7"KitchenUtilityDeckMaster19'10" x 18'7"Walk-inBathBed 214'11" x 24'10"Bed 321'1" x 16'1"Bed 413'8" x 14'11"Bath62'0" overall

Villa, 300 sq yd, 3,850 sq ft

What is still available

Availability by tower and floor band
TowerFloorsTypeStatus
Tower A1 to 103 BHKSold out
Tower A11 to 203 BHKFew left
Tower A21 to 324 BHKAvailable
Tower B1 to 143 BHKFew left
Tower B15 to 284 BHKAvailable

Availability is illustrative for this concept.

Amenities

  • Riverside clubhouse

    Over the Krishna

  • Palm avenue

    1.2 km landscaped loop

  • Sports courts

    Tennis, badminton, cricket nets

  • Temple

    Within the community

Tadepalli, close to everything

  1. Vijayawada city centre15 min
  2. Mangalagiri AIIMS12 min
  3. Vijayawada airport35 min

Drive times are indicative, off-peak.

City centre 15 minAIIMS 12 minAirport 35 min
Schematic, not to scale

Specifications

Structure
  • RCC framed with load-bearing core walls
Finishes
  • Italian marble in living areas
  • Teak main door
Construction progress (placeholder image)

Construction, slab by slab

  1. Mar 2026

    Roads and services

    Internal roads and drainage laid.

  2. Sep 2026

    Phase 1 villas roofed

    32 villas at roof level.

  3. Jun 2027, planned

    Handover

    Phase 1 possession.

See Palms in person

Daily, 10 am to 6 pm. A host meets you at the gate and walks you through a finished show home.

Call +91 90000 00000

RERA P06100XXXXXX (illustrative)

All Meridian projects

CallWhatsApp